OEM Factory for 200mm To 800mm Hdpe/pp Plastic Double Wall Corrugated Pipe Extruder Line

Short Description:

Our personnel are always inside the spirit of "continuous improvement and excellence", and together with the outstanding excellent goods, favorable price and...


  • FOB Price: US $20,000-100,000/set
  • Min.Order Quantity: 1 set
  • Supply Ability: 10 sets per month
  • Port: Qingdao
  • Payment Terms: L/C,D/A,D/P,T/T
  • Product Detail

    Service and support

    Inquiry and contact

    Product Tags

    Our personnel are always inside the spirit of "continuous improvement and excellence", and together with the outstanding excellent goods, favorable price and good after-sales services, we try to gain every customer's trust for OEM Factory for 200mm To 800mm Hdpe/pp Plastic Double Wall Corrugated Pipe Extruder Line, We welcome clients, business associations and close friends from all components on the world to get in touch with us and request cooperation for mutual rewards.
    Our personnel are always inside the spirit of "continuous improvement and excellence", and together with the outstanding excellent goods, favorable price and good after-sales services, we try to gain every customer's trust for 110-800mm Hdpe Double Wall Corrugated Pipe Production Line, Hdpe Corrugated Pipe Making Machine, Hdpe Double Wall Corrugated Pipe Extruder Machine, We've got developed large markets in many countries, such as Europe and the United States, Eastern Europe and Eastern Asia. Meanwhile with the powerful predominance in persons with ability, strict production management and business concept.we constantly carry on self-innovation, technological innovation, managing innovation and business concept innovation. To follow the world markets fashion, new goods are kept on researching and providing to guarantee our competitive advantage in styles, quality, price and service.
    Raw material:  PP / PE / PVC/ EVA/ PA

    corrugated pipe machine corrugated pipe machine
    Application:
    auto wire harness
    Electric thread-passing pipe
    Circuit of machine tool
    Protective pipe of lamps
    Pipe of air conditioner
    Pipe of washing machine
    Medical pipe
    Hookah pipe
    Lavatory pipe
    Production process:
    Loader---Single screw extruder---Die---Forming moulds---Water tank optional---Haul off and cutter (optional)---Double working---station winder

    Good cooling system

    corrugated pipe production line_副本 dwc pipe machie extruder corrugated pipe machine grear dwc pipe machine clamping steel panel corrugated pipe machinemold corrugated pipe machine template
    Technique parameter:

    Diemeter rang mm 4.5-9 9-32 16-50 20-100
    Machine model SJ30 SJ50 SJ65 SJ65
    Extruder LD 30:1 30:1 30:1 30:1
    Production capacity (kg/h) 10 30 50 100
    Extruder motor (kw) 4 15 18.5 37
    Forming machine motor (kw) 1.1 1.5 2.2 4
    Quanity of mould pairs 42 50 50 72
    Cooling style Wind&water cooling
    Production speed 6-10 8-12 8-12 2-6
    Metering way Inducting mode
    Coiling way Automatically&manually

  • Previous:
  • Next:

  • 1, WARRANTY TERMS: 

    1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE

    1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.

    1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

    2, DELIVERY CONDITIONS:

    2.1 DELIVERY CONDITION: FOB QINGDAO PORT.

    2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.

    2.3 SUPERVISION OF LOADINGTHE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.

    3, INSPECTION: 

    WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.

    4, INSTALLATION AND EQUIPMENT COMMISSIONING: 

    IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.

    If any interest to our machines, please kindly feel free to contact us:

    Email: info@tongsanextruder.com       info@wpcmachinery.com

    Phone: 0086-13953226564
    TEL:0086-532-82215318

    Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China

  • WhatsApp Online Chat !